How to Reduce Non-Value-Added Work in Engineering
Did you know engineers waste so much time on non-value-added work, they only spend about 54% of their time actually designing? How can you prevent them from wasting too much time on non-value-added work? Our research uncovered some significant engineering inefficiencies that contribute to this including: 29% percent of engineering time is spent working with … Continue reading How to Reduce Non-Value-Added Work in Engineering
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed